RSS Feeds for PDP VIII April 20, 2024 12:50
Vietnam Energy Forum
The Government conclusions on finalizing the Power Development Planning VIII

The Government conclusions on finalizing the Power Development Planning VIII

The Government Office has just announced the conclusion of Deputy Prime Minister Le Van Thanh at an online conference with localities on finalizing the National Power Development Planning for the period 2021 - 2030, with a vision to 2045 (PDP VIII).
The Prime Minister had a working meeting  with PVN

The Prime Minister had a working meeting with PVN

On the afternoon of March 16, Prime Minister (PM) Pham Minh Chinh chaired a working meeting with the Vietnam Oil and Gas Group (PVN) on the production and business situations of the group in 2021, the first two months of 2022 and in 2022.
Applying electricity storage systems for developing the clean energy system in Vietnam

Applying electricity storage systems for developing the clean energy system in Vietnam

Finalizing and analizing the results of "Scientific conference on application of energy storage systems and technologies to improve efficiency for renewable energy projects in Vietnam" held at the end of November 2021 in Hanoi, the Scientific Council of The Vietnam Energy Magazine has just published a report on a need and role of electricity storage systems in power system with a high renewable energy (RE) rate as Vietnamese power system (Today, RE capacity is 27.2 % of the national power system capacity and this figure should be 41.5 % in 2045 as by draft PDP VIII).
The Government Conclusion on the key power projects  and draft PDP VIII

The Government Conclusion on the key power projects and draft PDP VIII

The Government Office has just issued Announce No. 238/TB-VPCP on the conclusion of Deputy Prime Minister Le Van Thanh at the meeting of the National Steering Committee on Electricity Development for reviewing the implementation of the key power projects and draft content of Power Development Planning VIII (PDP VIII).
Conclusion of Deputy Prime Minister Le Van Thanh on Power Planning VIII

Conclusion of Deputy Prime Minister Le Van Thanh on Power Planning VIII

On July 14, 2021, at the Government Headquarters, Deputy Prime Minister Le Van Thanh chaired a meeting on the National Power Development Planning for period 2021 - 2030, with a vision to 2045 (PDP VIII).
Binh Thuan proposes to add more than 22 thousand MW to the PDP

Binh Thuan proposes to add more than 22 thousand MW to the PDP

Binh Thuan Provincial People's Committee (PPC) has just submitted a proposal to the Prime Minister (PM) and the Ministry of Industry and Trade (MOIT) to add 22,342 MW to the National Electricity Development Planning (PDP) for the period 2021 - 2030, with a vision up to 2045 (PDP VIII).
Ten typical events of Vietnam energy sector in 2020

Ten typical events of Vietnam energy sector in 2020

In 2020, despite many difficulties and challenges (from both inside and outside), especially the rage of Covid-19 pandemic, severe storms, and floods, trade tensions escalating and geopolitical competition complication ... our economy still maintained stability, the inflation and consumer price index (CPI) were well controlled, the GDP growth rate of 2, 91% - in the highest category in the world. It that great economic exploit, was an important contribution of the energy sector. Here are 10 typical events of the Vietnam energy sector in 2020, voted by the Scientific Council of Vietnam Energy Magazine.
Temporarily stopping to supplement  wind power projects to the PDP VII (adjusted)

Temporarily stopping to supplement wind power projects to the PDP VII (adjusted)

Due to not much time for individual appraising wind power projects to submit the Power Development Planning VIII (PDP VIII), the Ministry of Industry and Trade (MOIT) has decided to stop appraising wind power projects for supplementation to PDP VII (adjusted).
Approving the content of PDP VIII

Approving the content of PDP VIII

The Prime Minister has approved the content of the project on the National Power Development Planning in 2021 – 2030 period with a vision up to 2045 (PDP VIII).
1 2