RSS Feeds for the national grid April 20, 2024 20:30
Vietnam Energy Forum
National Load Dispatch Center ensures stable operations of power systems

National Load Dispatch Center ensures stable operations of power systems

The National Load Dispatch Center was established on April 11, 1994 to carry out necessary preparations for putting the North-South 500kV ultra-high voltage power transmission system into operation. The center is responsible for guiding and managing power generation, transmission and distribution activities within the national grid to achieve optimal technical and economic effectiveness, ensuring uninterrupted and safe operations of the national grid.