RSS Feeds for Kết quả tìm kiếm từ khóa: Nghi Son | Trang 2 May 18, 2024 17:21
Vietnam Energy Forum
successful installation of the super weight equipment for nghi son oil refinery and petrochemical project orpp

Successful installation of the super-weight equipment for Nghi Son Oil Refinery and Petrochemical Project (ORPP)

Vietnam Installation Corporation (Lilama) in collaboration with Japan NIPPONG EXPRESS (NEX) has successfully installed a 655 ton reactor in  Nghi Son ORPP.
powering the 500 kv line connecting nghi son 2 bot tpp with the national power system

Powering the 500 kV line connecting Nghi Son 2 BOT TPP with the National Power System

At 3:36 p.m. on July 27, 2021, the Central Power Projects Management Board (CPMB) in coordination with relevant units powering the 500 kV line connecting Nghi Son 2 BOT Thermal Power Plant (TPP) with the National Power System (NPS). The project invested by the National Power Transmission Corporation (EVNNPT), and managed by CPMB on behalf of EVNNPT was started for construction on April 09, 2018.
Trang trước