RSS Feeds for Kết quả tìm kiếm từ khóa: Panel Row A of BK-21 | Trang 1 May 02, 2024 10:35
Vietnam Energy Forum
the panel row a of bk 21 base at bach ho filed has been successfully installed

The Panel Row A of BK-21 base at Bach Ho filed has been successfully installed

In the morning of April 3, 2020, at the manufacture yard of Vietsovpetro, the Oil and Gas Construction, Survey and Repair Enterprise (Construction Enterprise) held timely successful installing Panel Row A of BK-21 base at Bach Ho field.
the superstructure of bk 21 wellhead rig at bach ho field has been successfully launched

The superstructure of BK-21 Wellhead Rig at Bach Ho field has been successfully launched

On September 1, 2020, as scheduled, the Construction Enterprise (under Vietsovpetro - the Vietnam - Russia Joint Venture) successfully launched the superstructure of BK-21 Wellhead Rig at Bach Ho (White Tiger) field.
successful launching the base of bk 21 wellhead rig at white tiger field

Successful launching the base of BK-21 wellhead rig at White Tiger field

On 13/5/2020, at the manufacturing site, the Enterprise for Constructing, Surveying and Repairing Petroleum Exploitation Projects (Construction Enterprise) has successfully launched the base of BK-21 uninhabited wellhead rig for White Tiger field to VSP-05 barge.
pm meets with head of intergovernmental panel on climate change

PM meets with head of Intergovernmental Panel on Climate Change

 Prime Minister Nguyen Xuan Phuc has asked the Intergovernmental Panel on Climate Change (IPCC) to work closely with and support Vietnam to effectively cope with climate change.
solis seminar episode xx pv panel micro crack problems and identification methods

Solis Seminar, Episode xx: PV Panel Micro-Crack Problems and Identification Methods

PID effect, micro-cracks, and hot spots are three important factors that can affect the performance of crystalline silicon photovoltaic modules. Among them, PID effect and hot spots usually appear after installation and operation of PV panels for a period of time. Micro-cracks are a common problem associated with solar photovoltaic modules and they are difficult to detect with the eyes. In view of these potentially hidden problems, how we identify and rectify them is important. In the last Solis Seminar, we introduced the problem of PID effect and its solutions. In this seminar, we will share with you the causes of cell micro-cracks, how to identify them and ultimately prevent them.
a japanese company discovered a new petroleum mine offshore vietnam

A Japanese Company discovered a new petroleum mine offshore Vietnam

According to the information from Japanese Idemitsu Kosan Company on Aug 21, the company has founded a new oil and gas mine at the fourth explorative well in the lots of 05-1b and 05-1c offshore Southern Vietnam.
pv power signed a mou on cooperation with a thailand group

PV Power signed a MOU on cooperation with a Thailand Group

On November 2, 2019, on the occasion of the 35th ASEAN Summit and relevant conferences, Vietnam Prime Minister Nguyen Xuan Phuc and Thai Deputy Prime Minister Anutin Charnvirakul witnessed the ceremony for signing a Memorandum of Understanding (MOU) on the investment cooperation between B. Grimm   Power Company under B. Grimm Group (Thailand) and Vietnam Oil and Gas Power Corporation (PV Power) under Vietnam National Oil and Gas Group (PVN).
promulgating a decree for the detailed regulations on a number of articles of the petroleum law

Promulgating a Decree for the detailed regulations on a number of articles of the Petroleum Law

On July 01, 2023, the Government promulgated Decree 45/2023/ND-CP for the detailed regulations on a number of articles of the Petroleum Law, including regulations on safety in the design, manufacture, construction and operation of petroleum projects.
vietnam and australia signed a mou to cooperate in developing a competitive electricity market

Vietnam and Australia signed a MoU to cooperate in developing a competitive electricity market

In Hanoi, Deputy Minister of Industry and Trade Nguyen Sinh Nhat Tan had a meeting with the Australian Deputy Minister in charge of Climate Change and Energy - Jenny McAllister. At the meeting, the two sides witnessed the signing ceremony of the "Memorandum of Understanding on Cooperation to promote the development of a competitive electricity market" between the Electricity Regulatory Authority and the Australian Embassy in Vietnam.
vinacomin carries out a survey for verifying the coal reserve at a level below 300 m

Vinacomin carries out a survey for verifying the coal reserve at a level below -300 m

Vietnam National Coal and Mineral Industry Holding Corporation Limited (Vinacomin) has directed its units to carry out business by a prior way to survey Northeast coal area for enhancing reserve from – 300 m up and verifying reserve at a level below – 300 m in order to carry out designing improvement and extension of the existing mines and developing new mines with more large capacity.    
the 500 kv north south transmission line a pride of being a typical project of vietnamese intelligence

The 500 kV North – South transmission line: A pride of being a typical project of Vietnamese intelligence

​On July 28th 2018, in Hanoi, Vietnam General Confederation of Labour (VGCL) has organized a program “Vietnam glory -  Impression of works" in order to glory the typical projects, which make great contribution to the construction and protection of motherland from 1975 to now. The 500 kV North- South transmission line is under management, operation by National Power Transmission Corporation (EVNNPT), it has a glory in contributing to the socio-economic development of the country.