Vietnam Energy Online - Search results for keyword "successfully%20installed". Hope you find the content you want on https://vietnamenergy.vn/
Vietnam has successfully made an air dryer for the boiler in coal-fired thermal power plant
09:40 | 11/05/2017
Specialists from the National Research Institute for Mechanical Engineering - NARIME (Ministry of Industry and Trade) have successfully researched, designed and made a rotary heat recovery air dryer for boiler in coal-fired thermal power plant.
Nghi Son Oil Refinery & Petrochemical Project: Successfully installating Reactor Towers
09:05 | 26/05/2015
According to the Vietnam Erection Corporation (Lilama), on May 22, at the Nghi Son Oil Refinery and Petrochemical Project, Lilama Erection Mechanical JSC (Lilama EMC) in cooperation with Nippon Express Company (NEX, Japan) successfully installed two reactor towers - SPM4 bidding package (AE00), with a total weight of nearly 900 tons.
The first time in Vietnam an oil cable successfully replaced by dry cable
12:44 | 17/06/2021
At 6 pm on June 16, 2021, EVN Repair Service Center (EVNPSC) in coordination with Hoa Binh Hydropower Company and related organizations successfully synchronized the unit No1 of Hoa Binh Hydropower Plant to the national power system after this unit stopping for repair and replacing a cable section from oil insulation to dry one with a length of 600 meters and a weight of 11 tons from 220 kV output of the step-up transformer of unit 1 to 220 kV transition substation.
Successfully installing the Unit#1 of Song Hau 1 Thermal Power Plant
10:47 | 26/04/2018
In the morning of April 20, 2018, at Song Hau 1 thermal power project (TPP) in Chau Thanh district, Hau Giang province, EPC General Contractor - Lilama Corporation successfully installed the generator of the Unit#1.