RSS Feeds for Kết quả tìm kiếm từ khóa: Coal fired thermal power plants | Trang 1 May 06, 2024 12:28
Vietnam Energy Forum
the regulations on handling ash and slag in bot coal fired thermal power plants

The regulations on handling ash and slag in BOT coal fired thermal power plants

The Prime Minister (PM) has just solved the problems on handling ash and slag in some of BOT coal fired thermal power plants (TPP) as flows: Hai Duong, Vinh Tan 1 projects apply the regulations on slag ground at the time of signing BOT contracts; Nam Dinh 1, Nghi Son 2, Van Phong 1, Vung Ang 2, Vinh Tan 3 and Song Hau 2 projects maintain the areas of slag grounds as approved in the feasibility study reports.
thermal power plants may face coal shortage

Thermal power plants may face coal shortage

Quang Ninh Province's historic rainstorm severely disrupted the area's coal supplies, and could temporarily shut down several thermal power plants.
pvn signed the principle contract to supply imported coal for pv power thermal power plants

PVN signed the principle contract to supply imported coal for PV Power thermal power plants

On November 2, 2016 in Hanoi, the Vietnam Oil and Gas Group (VN) in collaboration with the PetroVietnam Power Corporation (PV Power) held a cerymony to sign the principle contract to supply imported coal for the thermal power plants (PV Power TPP) invested by PVN.
pvn signs a coal import contract for the power thermal plants

PVN signs a coal import contract for the power thermal plants

In the Afternoon of October 3, 2014, in Hanoi, the PetroVietnam Coal Import and Supply Company (PV Power Coal) has signed a framework contract on long-term coal purchase with the Bukit Asam and Prima  Multi Minerals (Indonesia) partners.
projects to be implemented at two thermal power plants in northern vietnam

Projects to be implemented at two thermal power plants in northern Vietnam

Prime Minister Nguyen Xuan Phuc has issued instructions on the projects at the An Khanh–Bac Giang Thermal Power Plant in the northern province of Bac Giang and Duc Giang–Lao Cai Thermal Power Plant in the northern province of Lao Cai.
new regulations for handling ash and slag in thermal power plants

New regulations for handling ash and slag in thermal power plants

The Prime Minister has issued a decision on a number of solutions to handle and use ash, slag from thermal power plants as raw material for  building materials production.  
vinacomin has successfully applied cfb technology in the thermal power plants

Vinacomin has successfully applied CFB technology in the thermal power plants

According to the information from Vietnam National Coal – Mineral Industries Holding Corporation Limited (Vinacomin), after surveying worldwide experience for circulating fluidized bet (CFB) boiler technology, a technology for bad coal (low calorific value and high sulfur content) combustion to achieve lower emission of pollutants, Vinacomin has selected this technology for developing its 6 bet coal fired thermal power plants (TPP) as Na Duong (110 MW), Cao Ngan (115 MW), Son Dong (220 MW), Cam Pha (680 MW), Mao Khe (440 MW) and Nong Son (30 MW).
the coal fired thermal power plants should be only started if there are the waste handling plans

The coal-fired thermal power plants should be only started if there are the waste handling plans

Under the guidance of the Deputy Prime Minister (DPM) Hoang Trung Hai, the coal-fired thermal power plants (TPPs) that are in the investment preparation should be only allowed for starting construction if there are the clear waste (ash and slag) handing plans, or the contracts in principle with the demand companies.
regulating framework of electricity prices from thermal and hydrological power plants in 2017

Regulating framework of electricity prices from thermal and hydrological power plants in 2017

Ministry of Industry and Trade (MOIT) has issued Decision No 5107/QD-BCT on regulating the framework of electricity prices from thermal and hydrological power plants in 2017, according to which, the ceiling price level (without VAT) of coal-fired thermal plant is calculated by parameters of fuel used for power generation and the ceiling price level (without Royalties, forest environmental service fees and VAT) of hydrological plant is 1070 dong/kWh.
vietnam can borrow capital from the united states for developing lng power thermal plants

Vietnam can borrow capital from the United States for developing LNG power thermal plants

At the Conference of the Prime Minister with the Businesses on May 9, 2020 in Hanoi, Mr. Vu Tu Thanh - Deputy Director of the US-ASEAN Business Council informed that the USA has founded an International Financial Development Agency (DFC) with a fund of over $100 billion and more increasing for   supporting the partners of the US businesses. It is a very good opportunity for Vietnam energy businesses to borrow capital to import LNG and energy equipment from USA for developing Combined Cycle Gas Turbine (CCGT) LNG fired plants.
vinacomin efforts to supply coal for power plants at highest level

Vinacomin efforts to supply coal for power plants at highest level

In order to ensure the highest coal supply for thermal power plants (TPPs) with a maximal generation at the current hot season, the leadership of Vinacomin has directed the subsidiaries to effort coal supply for TPPs at highest level.
pewg proposed evn cooperate in fuel conversion for coal power plants

PEWG proposed EVN cooperate in fuel conversion for coal power plants

In Hanoi, Deputy General Director of the Electricity of Vietnam (EVN) Nguyen Tai Anh recently had a working meeting with the Electricity and Energy Group (PEWG) under the Vietnam Business Forum (VBF) on the cooperation in energy transition.
proposing the investors of coal power plants to develop a fuel conversion plan

Proposing the investors of coal power plants to develop a fuel conversion plan

The Ministry of Industry and Trade (MOIT) has just issued a document proposing the investors of coal-fired power plants develop a fuel conversion plan. Specifically, converting coal fuel to biomass fuel and ammonia when the power plant has operated for 20 years. And proposing to develop a plan to stop operation when the plant has operated for coal power plants that cannot convert fuel, or do not capture CO2 when the plants have operated for 40 years.
signing contract on the construction of tight coal storages for thai binh 2 thermal power project

Signing contract on the construction of tight coal storages for Thai Binh 2 Thermal Power Project.

On October 6, 2014, in Thai Binh province, PetroVietnam  Construction JSC  (PVC) and PVC Contractors Consortium of Thai Bình JSC Petroleum Investment and Trade Company (PVC TB), Song Da (Da River) JSC Petroleum Investment and Trade Company (PVSD) and  Consulting Company Ltd of National University of Civil Engineering (CCU) signed a contract on "design, estimate, supply and installation of steel structures and construction part implementation of the 3 tight storages” Package for Thai Binh 2  Thermal Power Plant (TPP) with a VND 914 billion value.
developing the lng fired power project in bac lieu

Developing the LNG fired Power Project in Bac Lieu

The  Bac Lieu Provincial People's Committee (PPC) has just signed a Memorandum of Understanding (MoU)  with the Investment Joint-Venture of Energy Capital Vietnam (USA) on developing a LNG fired power project in Bac Lieu province. 
Trang tiếp