Vietnam Energy Online - Search results for keyword "National Load Dispatch Center". Hope you find the content you want on https://vietnamenergy.vn/
National Load Dispatch Center ensures stable operations of power systems
17:26 | 28/05/2014
The National Load Dispatch Center was established on April 11, 1994 to carry out necessary preparations for putting the North-South 500kV ultra-high voltage power transmission system into operation. The center is responsible for guiding and managing power generation, transmission and distribution activities within the national grid to achieve optimal technical and economic effectiveness, ensuring uninterrupted and safe operations of the national grid.
The national electricity load grew by about 10.9% over the same period in the first months of 2024
09:39 | 23/02/2024
From the beginning of 2024, the national load will grow by about 10.9% compared to the same period in 2023. Among them, the North will increase by 10.8%, the South by 12% and the Central region by 6.9%.
Director of National Power System Dispatching Center (A0) has been appointed to the position of EVN Deputy General Director
15:00 | 04/07/2015
The Electricity of Vietnam (EVN) has announced the Decision on appointing Mr. Ngo Son Hai, Director of the National Power System Dispatching Center (A0) to the position of EVN Deputy General Director (in charge of production field).
The new regulations on the electric load adjustment
11:05 | 27/11/2017
The Ministry of Industry and Trade (MOIT) has recently issued the Circulation No 23/2017/TT-BCT on the order of electric load adjustment which regulates that the dispatching centers are responsive to assess the need of electric load adjustment for the national and regional and local power systems.
Researching to found Vietnam Renewable Energy Center
12:18 | 17/02/2022
The Government Office issued Announcement No. 40/TB-VPCP on the conclusion of the Prime Minister - Head of the National Steering Committee at the second meeting of the National Steering Committee to implement commitments of Vietnam at 26thconference of the Participants in the United Nations Framework Convention on Climate Change.
Considering to supplement Long Son Power Center to the NPP
11:41 | 10/01/2020
Mr. Hoang Quoc Vuong, the Deputy Minister of Industry and Trade (MOIT) has just had a meeting with the leaders of Ba Ria - Vung Tau Provincial People's Committee and the provincial departments on the liquefied petroleum gas (LNG) power projects in this province.
GE Launches Global Powering Efficiency Center
13:38 | 09/03/2017
On March 8th 2017, GE Launches Global Powering Efficiency Center of Excellence, Offering Solutions to Help Reduce Coal Plant Emissions by up to 11 Percent.
Kick off the Projects in Quang Trach Power Center
09:05 | 22/11/2016
The EVN Chairman Duong Quan Thanh recently has have a working meeting with Quang Binh provincial leadership on the Projects in Quang Trach Power Center.
Dong Thap Muoi biotechnology center to be constructed
10:10 | 26/06/2016
The Mekong Delta province of Long An has been making preparations to build a biotechnology centre for the Dong Thap Muoi (Plain of Reeds) region, according to Pham Van Ranh, Secretary of the provincial Party Committee.
The first center on remote operating solar power plant in Vietnam
08:06 | 11/10/2019
The Power Engineering Consulting Joint Stock Company 2 (PECC2) has just inaugurated and put into operation the first Vietnam Control Center on Remote Operating Power Plant (OCC) at its headquarter in Ho Chi Minh City.
Announcing the adjustment of planning of Dung Quat Power Center
17:24 | 03/03/2019
On February 28, in Quang Ngai city, the Ministry of Industry and Trade (MoIT) in coordination with Electricity of Vietnam (EVN) to organize a ceremony to announce the adjustment of the site planning of the Power & Gas Center in Central Region - Dung Quat Power Center.
Powering the 500kV distribution yard at Vung Ang Power Center
15:03 | 04/06/2014
Recently, the Management Board of Vung Ang- Quang Trach PV Power Project in collaboration with the Contractors as Viet Nam Industrial Construction Corporation (Vinaincon), Power engineering consulting joint stock Company 1 (PECC1), Bach Dang Construction Corporation (BĐCC) held the Ceremony for powering the 500kV distribution yard at Vung Ang Power Center.
Goldwind Asia Remote Operation Center- Think Globally and Act Locally
08:48 | 01/04/2022
At the end of 2021, Goldwind- the top wind turbine OEM in China and the second turbine OEM supplier of the world, had just established the Goldwind Asia Remote Operation Center (known as “Goldwind Asia ROC”) in Ho Chi Minh City, Vietnam. Goldwind Asia ROC will be a regional hub for innovation, development and integration with the Goldwind International ROC and Site Monitoring.
Starting the technical constituent of Hai Lang LNG Power Center
14:12 | 17/01/2022
On January 15, 2022, Quang Tri Provincial People's Committee and investor consortium, including T&T Group and the Korean Hanwha Energy Joint Stock Company - HANWHA, South Korea Electricity Corporation- KOSPO and Korea Gas Corporation - KOGAS officially started the technical constituent of 1500 MW phase 1 Hai Lang LNG Power Center in Quang Tri province.
Vung Ang 3 LNG Power Center attracts the Investors
10:04 | 15/07/2021
Recently, a consortium of 3 investors, Siemens Energy, KG Electric Power Corporation and Power Engineering Consulting Joint Stock Company 2 (PECC 2), has just sent a document to the Ha Tinh Provincial People's Committee to submit a Pre-Feasibility Study Report and an investment proposal for Vung Ang 3 LNG Power Center in Vung Ang Economic Zone, Ky Anh town, Ha Tinh province.