Vietnam Energy Online - Search results for keyword "successfully synchronized". Hope you find the content you want on https://vietnamenergy.vn/
The third unit of Trung Son HPP has been synchronized with the National Power System
14:08 | 05/05/2017
The third unit of Trung Son hydropower plant has synchronized with the National Power System just after the second one just for over a month.
The superstructure of BK-21 Wellhead Rig at Bach Ho field has been successfully launched
11:35 | 04/09/2020
On September 1, 2020, as scheduled, the Construction Enterprise (under Vietsovpetro - the Vietnam - Russia Joint Venture) successfully launched the superstructure of BK-21 Wellhead Rig at Bach Ho (White Tiger) field.
The rotor of the generator of Da Nhim HP Extension Project has been successfully installed
11:31 | 14/08/2018
The Da Nhim- Ham Thuan- Da Mi Hydropower Joint Stock Company has informed that the Management Board of Da Nhim Hydropower Plant Extension Project in cooperation with the contractors has successfully installed the rotor of a generator of Da Nhim Hydropower Plant Extension Project.
Successfully energizing the first 500kV power grid projects invested by private sector in Vietnam
10:40 | 04/10/2020
On September 29, 2020, in Quan The Hamlet, Phuoc Minh Commune, Thuan Nam District, Ninh Thuan Province, Trung Nam Investment and Construction Joint Stock Company (Trungnam Group) successfully energizing the first super high voltage project invested in Vietnam by private sector as 500 kV transformer substation with a capacity of 2x900 MVA and combined 500/220 kV transmission line (500kV and 220 kV lines on the same tower) with a length of 17 km for releasing power capacity of Trung Nam Thuan Nam solar power project with a capacity of 450 MW project
The Panel Row A of BK-21 base at Bach Ho filed has been successfully installed
08:07 | 07/04/2020
In the morning of April 3, 2020, at the manufacture yard of Vietsovpetro, the Oil and Gas Construction, Survey and Repair Enterprise (Construction Enterprise) held timely successful installing Panel Row A of BK-21 base at Bach Ho field.
Vietnam has successfully made an air dryer for the boiler in coal-fired thermal power plant
09:40 | 11/05/2017
Specialists from the National Research Institute for Mechanical Engineering - NARIME (Ministry of Industry and Trade) have successfully researched, designed and made a rotary heat recovery air dryer for boiler in coal-fired thermal power plant.
Nghi Son Oil Refinery & Petrochemical Project: Successfully installating Reactor Towers
09:05 | 26/05/2015
According to the Vietnam Erection Corporation (Lilama), on May 22, at the Nghi Son Oil Refinery and Petrochemical Project, Lilama Erection Mechanical JSC (Lilama EMC) in cooperation with Nippon Express Company (NEX, Japan) successfully installed two reactor towers - SPM4 bidding package (AE00), with a total weight of nearly 900 tons.
Unit 1 of Thai Binh 2 TPP has synchronized with the National Power System
08:58 | 17/05/2022
On the May 13 afternoon, at Thai Binh 2 Thermal Power Plant (TPP), the Vietnam Oil and Gas Group (PVN) held a ceremony for successful synchronizing unit 1 of Thai Binh 2 TPP with the National Power System.
Unit 1 of Nghi Son TPP 2 has been synchronized into the national power system
08:59 | 23/07/2021
At Nghi Son 2 Thermal Power Plant project (Hai Ha commune, Tinh Gia district, Thanh Hoa province), the general contractor and joint venture of contractors have successfully synchronized unit 1 into the national power sýtem. This event marks the efforts of the investor, general contractor and construction contractors to overcome difficulties in the complicated situation of the Covid-19 pandemic.
KCP – Phu Yen Biomass Power Plant is officially synchronized with the National System
13:40 | 04/04/2017
The 100% India investment KCP - Phu Yen Biogas Power Plant – phase I has been officially synchronized with National Power System.
The Unit No2 of Xekaman Hydropower plant No1 has synchronized with National Power System
16:32 | 05/12/2016
Information from the Central Power Corporation (EVNCPC) said, on November 29, 2016, the Unit No2 of Xekaman Hydropower plant (HPP) No1 has successfully synchronized with national power system.
The unit #1 of the Mong Duong TPP number1 has synchronized to National Power System
08:39 | 13/01/2015
The unit #1 of Mong Duong TPP No1 (540MW) has successfully synchronized to the National Power System with a 80MW highest available capacity for the first testing generation.
Unit No 1 of Song Bung 4 HP has been synchronized with the National Power System
09:39 | 06/10/2014
The Electricity of Vietnam (EVN) informed, unit No1 of the Song Bung 4 Hydropower Plant (HP) has been synchronized with the National Power System through Thanh My 500/220kV transformer substation.
Unit 1 of Thuong Kon Tum Hydropower plant has been synchronized with the national power system
12:01 | 27/03/2021
At 14:55 on March 24, 2021, at Thuong Kon Tum Hydropower Plant, Ngok Tem commune, Kon Plong district, Kon Tum province, Unit 1 of the Thuong Kon Tum Hydropower Plant (HPP) has successfully synchronized with the national system.
The first time in Vietnam an oil cable successfully replaced by dry cable
12:44 | 17/06/2021
At 6 pm on June 16, 2021, EVN Repair Service Center (EVNPSC) in coordination with Hoa Binh Hydropower Company and related organizations successfully synchronized the unit No1 of Hoa Binh Hydropower Plant to the national power system after this unit stopping for repair and replacing a cable section from oil insulation to dry one with a length of 600 meters and a weight of 11 tons from 220 kV output of the step-up transformer of unit 1 to 220 kV transition substation.