RSS Feeds for national power system December 05, 2024 05:17
Vietnam Energy Forum
Ceremony to transfer the National Power System Dispatch Center from EVN to the MOIT

Ceremony to transfer the National Power System Dispatch Center from EVN to the MOIT

The ceremony to transfer the National Power System Dispatch Center from the Electricity of Vietnam (EVN), the State Capital Management Committee at Enterprises to the Ministry of Industry and Trade was recently held in Hanoi (in the form of direct and online).
The achievements and technical manageable targets of EVN

The achievements and technical manageable targets of EVN

The inform from the Electricity of Vietnam (EVN) said, in the recent years, the technical manageable assignments of EVN has achieved remarkable achievements, making an important contribution to improving the quality and reliability of power supply, in accordant with the power system with a largest installed capacity in Southeast Asia and 23rd in the world.
Approving the plan for 'electricity supply and operation of the national power system' in 2023

Approving the plan for 'electricity supply and operation of the national power system' in 2023

Considering proposals of the Electricity of Vietnam (EVN) on supplementing the electricity system operation plan in 2023 and according to the proposal of the Electricity Regulatory Authority, the Ministry of Industry and Trade has just approved the "plan for electricity supply and operation of the national power system in 2023”. The Vietnam Energy Magazine would like to raise the content of this Decision for the reference of our readers.
Unit 1 of Thai Binh 2 TPP has synchronized with the National Power System

Unit 1 of Thai Binh 2 TPP has synchronized with the National Power System

On the May 13 afternoon, at Thai Binh 2 Thermal Power Plant (TPP), the Vietnam Oil and Gas Group (PVN) held a ceremony for successful synchronizing unit 1 of Thai Binh 2 TPP with the National Power System.
Powering the 500 kV line connecting Nghi Son 2 BOT TPP with the National Power System

Powering the 500 kV line connecting Nghi Son 2 BOT TPP with the National Power System

At 3:36 p.m. on July 27, 2021, the Central Power Projects Management Board (CPMB) in coordination with relevant units powering the 500 kV line connecting Nghi Son 2 BOT Thermal Power Plant (TPP) with the National Power System (NPS). The project invested by the National Power Transmission Corporation (EVNNPT), and managed by CPMB on behalf of EVNNPT was started for construction on April 09, 2018.
Unit 1 of Nghi Son TPP 2 has been  synchronized into the national power system

Unit 1 of Nghi Son TPP 2 has been synchronized into the national power system

At Nghi Son 2 Thermal Power Plant project (Hai Ha commune, Tinh Gia district, Thanh Hoa province), the general contractor and joint venture of contractors have successfully synchronized unit 1 into the national power sýtem. This event marks the efforts of the investor, general contractor and construction contractors to overcome difficulties in the complicated situation of the Covid-19 pandemic.
In the first six months of 2021, Vietnam NPS received 14.69 billion kWh from the renewable energy projects

In the first six months of 2021, Vietnam NPS received 14.69 billion kWh from the renewable energy projects

Electricity of Vietnam (EVN) informed that in the first 6 months of 2021, the electricity generation and import of the whole system reached 128.51 billion kWh, increasing 7.4% over the same period in 2020, including 14.69 billion kWh (equal to 11.4%)from the renewable energy projects, 624 million kWh (0.5%) from import.
Unit 1 of Thuong Kon Tum Hydropower plant has been synchronized with the national power system

Unit 1 of Thuong Kon Tum Hydropower plant has been synchronized with the national power system

At 14:55 on March 24, 2021, at Thuong Kon Tum Hydropower Plant, Ngok Tem commune, Kon Plong district, Kon Tum province, Unit 1 of the Thuong Kon Tum Hydropower Plant (HPP) has successfully synchronized with the national system.
Dak Nong province to develop the rooftop solar power projects

Dak Nong province to develop the rooftop solar power projects

The Decision No13/2020 / QD-TTg of the Prime Minister on mechanisms to encourage developing solar power in Vietnam (Decision 13 for short), effective from May 22, 2020 (replacing Decision 11/2017 / QD-TTg expired on June 30, 2019) made motive power for many businesses and households to complete installing the solar power systems previously connected to the national power system.
The first SPP in Binh Dinh has been synchronized with the NPS

The first SPP in Binh Dinh has been synchronized with the NPS

On May 20, 2019, Cat Hiep solar power project (SPP) with a capacity of 49.5 MWp and average output of 70,000 – 80,000 kWh per year, the first SPP in Binh Dinh province was connected to the national power system for a commissioning operation.
1 2 3