RSS Feeds for Powering Lai Chau 500kV transformer substation | Tạp chí Năng lượng Việt Nam November 06, 2024 06:32
Vietnam Energy Forum

Powering Lai Chau 500kV transformer substation

 - On April 1, 2018 at Lai Chau 500kV transformer substation (in Nam Hang Commune, Nam Nhun district, Lai Chau province ), the Central Power Project Management Board (CPMB) in coordination with the related units put into operation Lai Chau 500kV transformer substation and a turned branch.

 Lai Chau 500kV transformer substation and a turned branch.

This project invested by the National Electricity Transmission Corporation (EVNNPT), designed and constructed by Single Member Power Construction Company Ltd. 4 (PCC4), managed in construction by CPMB on behalf of EVNNPT, undertaken for supervision by EVN International Joint Stock Company (EVNI) and Power Engineering Consulting Joint Stock Company 1 (PECC1), tested by Electric Testing and Researching Joint Stock Company (ETRC), and received for operation by Power Transmission Company (PTC1).

The project with a total investment of VND 777 billion includes:

1/ An open transformer substation including: 2x450MVA transformers at 500/220/35kV and 2x250MVA transformers at 220/110/22kV, of which, in the first stage, only one transformer of 450MVA and one 250MVA were set up; 500kV, 220 and 110kV feeders; and other relevant equipment for the transformer substation.

2/ A double line with a length of 1,547 meters from Son La – Lai Chau 500kV double transmission line to Lai Chau 500kV transformer substation.

Powering these project has contributed to transmitting power from Lai Chau and Son La hydropower plants to the national power system, reducing general loss, and promoting reliability,    stability and safe operation of power system.

VietnamEnergy.vn

 

News

Posted news

[More view]