Proposal to Assign Rooftop Solar Power Development Targets (Self-Produced, Self-Consumed) to Localities

 - The Ministry of Industry and Trade has submitted a proposal to the Government to issue a Resolution assigning targets for the development of self-produced, self-consumed rooftop solar power for localities from now through the end of 2027, with the 2028–2030 period to be considered subsequently.

The key contents of the Ministry of Industry and Trade’s Submission No. 9904/TTr-BCT dated 20 November 2026 are as follows:

1. Strive to achieve the 2030 target for the development of self-produced, self-consumed rooftop solar power under the Revised Power Development Plan VIII, ensuring in particular that the target for rooftop solar capacity development from now through the end of 2027, totalling 6,000 MW, is achieved.

2. The development of self-produced, self-consumed rooftop solar power combined with energy storage systems is one of the important, urgent and strategically significant solutions for ensuring national energy security. It will help effectively harness distributed renewable energy potential, reduce peak electricity demand, particularly during daytime hours, ease pressure on electricity supply and promote a green and sustainable energy transition.

3. Mobilize social resources to the fullest extent and encourage the proactive participation of organizations and individuals in investing in self-produced, self-consumed rooftop solar power systems at government offices, public institutions, schools, healthcare facilities, production and business establishments, service facilities and households. Prioritize effective use of existing rooftop space and align on-site power generation with actual electricity consumption, reducing the need for investment in new centralized power generation sources and easing pressure on the transmission and distribution grids.

4. Facilitate the installation, grid connection and operation of rooftop solar power systems, as well as the completion of related procedures (including the purchase and sale of surplus electricity); ensure operational safety and grid connectivity in accordance with the law. Development must be consistent with the objectives set out in power development plans and programmes, the grid’s capacity to absorb additional power, technical safety requirements, power system security, and economic and social efficiency.

5. The allocation of self-produced, self-consumed rooftop solar power capacity development targets to provinces and centrally governed cities shall be based on the requirements of the Revised Power Development Plan VIII; directions issued by Government leaders under CT-10, TB-490, TB-531 and VB-10790; the projected electricity load growth of each province and city in 2027; and proposals submitted by local authorities.

6. Determining targets in proportion to the electricity load growth of each province and city ensures transparency, objectivity and ease of determination and verification, as electricity load data and growth forecasts are compiled and monitored annually by EVN and the power corporations. This method also ensures that allocations are appropriate to the demand and development potential of each locality. Provinces and cities with high electricity load growth, numerous industrial parks and industrial clusters, and substantial factory rooftop potential are well positioned to effectively develop on-site rooftop solar power, reduce the amount of electricity drawn from the power system, ease transmission pressure and mitigate the risk of grid overload.

Replacing the previous method of determining targets with an approach based on electricity load growth is expected to provide an appropriate allocation solution, with approximately 5,630 MW allocated from now through the end of 2027. The immediate requirement, in accordance with the direction of Government leaders under Notice TB-490, is to develop approximately 6,000 MW by the end of 2027. In addition, under Document No. 7404/BCT-DL dated 16 September 2026, the Ministry of Industry and Trade requested ministries, ministerial-level agencies, provincial People’s Councils and People’s Committees, and EVN to prepare investment plans and strive to complete the installation and commissioning of rooftop solar power systems on public office buildings under their management before 31 March 2027, in accordance with CT-10. The Ministry therefore proposes an initial allocation of self-produced, self-consumed rooftop solar power capacity development targets for the period through the end of 2027.

Conditions for ensuring implementation of the Resolution:

1. Following the issuance of the Resolution, the agencies and organizations subject to its provisions shall be responsible for implementation. The Ministry of Industry and Trade, specifically the Electricity Authority, shall monitor and urge implementation and consolidate reports for submission to the Government and the Prime Minister on the results achieved by localities. At the local level, provincial People’s Committees, Provincial People’s Committee Offices, Departments of Industry and Trade, Departments of Finance and commune-level People’s Committees shall direct and organize implementation in accordance with their assigned functions and responsibilities.

2. Funding for the installation of power generation systems will be sourced from socialized investment, the state budget and enterprises’ own financial resources.

3. Based on the current market reference installation cost of rooftop solar power systems (excluding BESS) of approximately VND 12 million per kW, and the total national capacity of 5,630 MW proposed for allocation under the Resolution through the end of 2027, the estimated total investment capital required for rooftop solar installations under this Resolution is VND 67.56 trillion (an average of approximately VND 1.987 trillion per province).

4. Following its review, the Ministry of Industry and Trade has not identified any provisions in the draft Resolution that would be inconsistent with national defence and security requirements.

Recommendations and proposals of the Ministry of Industry and Trade:

1. To ensure feasibility in implementation, the Ministry recommends that consideration be given to the mandatory wording of “targets” in the Resolution, replacing it with “strive to achieve the targets” or “strive to fulfil the targets”. This would be consistent with Prime Ministerial Directive No. 10/CT-TTg dated 30 March 2026, the objectives of the Revised Power Development Plan VIII, and proposals from several localities that targets should allow them to strive for the highest possible level of achievement, taking into account actual demand, capacity and objective factors, as set out in the Ministry of Industry and Trade’s Report No. 892/BC-BCT dated 4 November 2026.

2. Self-produced, self-consumed rooftop solar power development targets are allocated based on the electricity load growth of each locality during 2026–2027. The proposed total capacity allocation is approximately 5,630 MW, to be implemented through the end of 2027 in two phases: 2,630 MW by the end of March 2027 and 3,000 MW during the remainder of the year. Provinces and cities in the northern region should strive to complete their entire allocated targets before the dry season in the second quarter of 2027.

The following table summarizes the proposed rooftop solar power capacity development by locality from now through the end of 2027, as submitted by local authorities and attached to the Ministry of Industry and Trade’s Submission No. 9904/TTr-BCT dated 20 November 2026:

No.

Province/City

Households (MW)

Government Offices and Public Institutions (MW)

Production and Business Establishments (MW)

Remarks

1

Hanoi City

2

Hai Phong City

4

50

3

Tuyen Quang

2

3

2.5

4

Cao Bang

4.83

1.697

5

Lao Cai

7

4

60

6

Thai Nguyen

3

70

7

Lang Son

6

72.4

8

Son La

20

9

Dien Bien

10

Lai Chau

3

0.7

0.3

11

Phu Tho

3.9

130

12

Hung Yen

13

Bac Ninh

14

Quang Ninh

10.33

229

15

Ninh Binh

16

Thanh Hoa

14.5

2.6

160.6

17

Nghe An

2

20

18

Ha Tinh

10

5

30

19

Quang Tri

15.92

0.56

3.4

20

Hue City

7

14

21

Da Nang City

141

7.372

22

Quang Ngai

5

60

23

Gia Lai

50

4.88

22

24

Dak Lak

21.76

42.6

25

Khanh Hoa

Data report not yet submitted

26

Ho Chi Minh City

Data report not yet submitted

27

Lam Dong

28

Dong Nai City

Data report not yet submitted

29

Tay Ninh

Data report not yet submitted

30

Can Tho City

5

31

Vinh Long

30

5

50

32

Dong Thap

8.4

3.12

15

33

An Giang

50

160

34

Ca Mau

23.333

Total:

374

247

1,057

Notes:

(1) Blank cells in the table indicate that data have not yet been provided because the local authorities have not completed the calculation and allocation of specific capacity levels for the 2026–2027 period.

(2) Based on the data provided above, the total proposed development capacity across the three categories for 2026–2027 is 1,678 MW. This figure excludes the capacity of certain provinces and cities that have not yet determined their capacity allocations or have not submitted data reports as requested by the Ministry of Industry and Trade./.

VietnamEnergy.vn