RSS Feeds for The Regulations on development and PPA for the solar power projects | Tạp chí Năng lượng Việt Nam November 24, 2024 15:10
Vietnam Energy Forum

The Regulations on development and PPA for the solar power projects

 - The Minister of Industry and Trade has just issued Circular No. 18/2020 / TT-BCT to regulate development and model power purchase agreement (PPA) for the solar power projects (Circular 18).

The Circular 18 stipulates and guides to implement the Decision No. 13/2020 / QD-TTg of Prime Minister at April 6, 2020 on mechanisms to encourage developing solar power projects in Vietnam (Decision 13).

The Circular 18 includes clauses stipulating  development of grid-connected solar power projects as:

1 / The power purchase prices

2 / Contents of the project basic design documents and other contents.

3 / Area of ​​land, water surface occupied by the project with a definite term.

And development of rooftop solar power systems as:

1 / Power purchase prices in the case that the power purchaser is Electricity of Vietnam (EVN) and in the case that the power purchaser is not EVN.

2 / Implementation sequence for rooftop solar power system.

3 / Exempting the electricity operation license and other contents.

Besides, the Ministry of Industry and Trade issues model PPAs applicable to grid-connected solar power projects and  to rooftop solar power systems.

Circular 18 takes effect from August 31, 2020.

VER.

News

Posted news

[More view]